Lifts & Escalators by FUJI
Who we are
Lifts & Escalators by FUJI GLOBAL
Welcome to Lifts & Elevators by Fuji Global, where innovation meets functionality. Explore our diverse range of elevator solutions tailored to suit your every need. FUJI Elevator, a renowned Japanese brand, brings extensive experience in lift manufacturing from Japan and China. We prioritize elevator quality, R&D, manufacturing, sales, installation, and maintenance, with customer satisfaction as our benchmark. Our elevator test tower stands at 89 meters, with elevators capable of speeds up to 7m/s. With a strategic network of trusted suppliers spanning the globe, we ensure access to an extensive range of top-quality products tailored to meet the diverse needs of our clients.
Our Lifts & Elevators
Electric Traction (MRL)
Efficient vertical transportation with sleek Electric Traction MRL elevators, designed for modern buildings.
Hydraulic Elevators
Robust vertical mobility solutions for low-rise buildings, ensuring efficiency and structural integrity.
Vacuum Elevators
Embrace the future with pneumatic technology, offering energy-efficient vertical mobility and modern style.
Our Escalators
Explore our comprehensive range of escalators designed to elevate your mobility experience in any setting. Whether navigating bustling urban environments, busy shopping centers, or architectural marvels, we have the perfect solution. Our indoor escalators blend seamlessly with interior designs, ensuring smooth and effortless vertical transportation, while our robust outdoor escalators are engineered to withstand the elements and deliver unparalleled performance.
For high-traffic and heavy-duty applications, our heavy-duty escalators provide unmatched durability and efficiency. Streamline your shopping experience with our innovative shopping cart escalators, offering effortless transportation for shoppers and their carts. Our diverse range of products ensures optimal performance, safety, and reliability.
Automobile Parking Systems
Parking structures, categorized by type and construction, include independent constructions for underground plazas and those within existing buildings. Planning should consider the environment and allow for integration, enabling external advertisements to improve economic efficiency.
This system is of a high space utilization, which provide 5-7 layers of parking lots and fully utilize the above and underground space, with advantages of short waiting and low energy consumption.
PSH-RH Multi Story Combination (With PIT-LIFT Sliding)
This system is of a high space utilization, which provide 5-7 layers of parking lots and fully utilize the above and underground space, with advantages of short waiting and low energy consumption.
PJS-RH TWO STORY (HOME-USE PARKING SYSTEM)
Postposition Cantilever Sort
Mid Vertical Column Type
Four Vertical Columns Type
PCS-RH VERTICAL LIFTING (MECHANICAL PARKING SYSTEM)
Vertical lifting mechanical parking system is also called tower type three-dimensional parking system. It transversely moves the car or carrier through the carrier elevation and traversing mechanism in the carrier to fulfill access of the car. Full use of the space: Large capacity, small covering space, 40 to 50 cars can be parked within an area of 50 square meters, it is dozens of the times higher than in traditional ground parking system.
Intellectual and environmental protection: It applies AC variable frequency and speed governor, wire rope traction and drive mode with quick speed, low noise, little vibration, sound energy-saving and environmental protection.
PXD-RH FULLY AUTOMATIC AISLE (STACKING PARKING SYSTEM)
Aisle-stacking parking system mainly makes horizontal movement through intellectual carrier (stacker) along the aisle. Meanwhile the carrier sends the car beside the designated position, then to the parking space (or take the car from parking space) according to the parking position of access car. Aisle-stacking parking system is fit for 8-2 deck parking.
Car entry/exit setting: Entry/exit can be either at the ground floor, i.e. initial floor of the construction or underground floor. Full use of the space: It can fully use the special space. The whole equipment only need one
entry/exit.
Highly intellectual: Fully intellectual automatic control is simple and prompt.
Project Name | Project Location | Year |
---|---|---|
INTEGRAL ENGINEERING | AL MADAM,SHARJAH | 30/11/2016 |
RK Gulf | DUBAI LAND, DUBAI | 19/09/2017 |
AL NASER ENGINEERING | AL NABBA,SHARJAH | 08/10/2018 |
METROTEC | AL JAFILIYA,DUBAI | 01/03/2017 |
DAR AL ADHAM BUILDING CONSTRUCTIONS | DIP 2ND,DUBAI | 15/09/2018 |
Elite Land Mark ZB CONSTRUCTIONS LLC | AL NAIF,DUBAI | 06/01/2018 |
DAR AL ADHAM BUILDING CONSTRUCTIONS | AL BADDA,,DUBAI | 01/07/2018 |
INTERIORS INTERNATIONAL INDUSTRIES | JEBEL ALI IND AREA,DUBAI | 13/02/2017 |
MR.DAR AL ADHAM AL ADHAM BUILDING CONSTRUCTIONS | DIP, Dubai | 04/04/2017 |
Elite Land Mark | DIP, Dubai | 04/05/2017 |
MR.KHALID AL MULLA | AL NOUF,SHARJAH | 01/01/2017 |
EMIRATES PROPERTIES | AL HAMRIYA,DUBAI | 01/04/2017 |
Engineering Consortium Consulting Eng | INTERNATIONAL CITY | 31/08/2019 |
Silver Gate Building Contracting | Southern Sector Rawdha 3, Ajman | 30/09/2018 |
New East General Trading (ZB Construction) | JAFZA South | 08/08/2018 |
Protec Group | Ras Al Khimah | 06/08/2017 |
Al Jihan Gulf Horizon General Cont. (Green Bridge) | Ras Al Khor | 13/05/2018 |
Ahmed Anwar Kasam - Interiors | Jebel Ali Ind Area | 14/08/2018 |
Moaza Mohd Bakhit Al Humari | Al Barsha | 20/06/2018 |
Ahmed Mohd Matar Ghurab Al Mehari (Villa) | Muhaishnah | 24/11/2018 |
Qumasha Saif | Nad Al Shiba | 03/11/2018 |
Hot Pack FZCO | Techno Park | 26/05/2019 |
Souq Al Kabeer (Bagali Build) | Souq Al Kabeer | 24/10/2019 |
Sam Building - Lals Group | Techno Park | 09/08/2018 |
Baniyas Real Estate | Mowaihat Ajman | 14/04/2019 |
Dreamsky Contracting LLC | Nad Al Sheba4th | 09/04/2019 |
Mabani Real Estate | Al Rawdha 1 Ajman | 01/06/2018 |
City Diamond Contracting LLC (Nimbus Logistics) | JAFZ | 10/02/2019 |
Lals Group - Home R Us Lals Group - Metrotec Eng | Jabel Ali | 01/11/2018 |
Mr.Tariq Saeed Bin Althani | Naif | 27/10/2019 |
Mr.Mohd Iqbal Patel ( Silver Gate) | Ajman | 06/10/2019 |
Mr.Saeed Rashed Rashed Al Yateem Almuhiri | Nal AL Sheba | 20/04/2019 |
Elite Landmark Construction LLC | AL Murar | 14/07/2018 |
K&B Building contracting LLC | City Center Sector Nakheel Ajman | 01/08/2019 |
European Union Building Cont LLC | Al Boutinah, Sharjah | 01/04/2019 |
Mr.Osama Hashem Alawi Alsaf Al Tawar | Al Tawar | 07/04/2019 |
Lamcy Plaza | Oud Metha | |
Maryam Ali Abdulla (Villa) | Oud Muteena 2nd | 08/07/2017 |
Hotpack Packaging Industries LLC (Villa) | DIP, Dubai | 16/10/2017 |
Mr. Malalla Hassan Al Yassi | Ajman | 16/02/2020 |
AFSGT General Trading LLC | Umm Al Thoob, Sector 2, Umm Al Quwain | 07/08/2018 |
Dubai City Builders | Al Manara | 08/12/2018 |
Mr. Mohammed Suhrab Ali Al Ahli | Al Khawaneej | 25/05/2019 |
Sam Building Contracting LLC | Jabel Ali Industrial Area 1, Dubai | 07/02/2019 |
Hot Pack Industries LLC | Umm Al Quwain | 14/01/2019 |
Al Tawhidi Real Estate | Al Mankhool | 21/11/2018 |
DAMAC - Luxury Facilities Management LLC | Tecom, Dubai | 16/02/2019 |
Sam Building Contracting LLC (GAC) | Jabel Ali | 05/02/2020 |
European Union Building Contracting LLC | Al Muwailah, Sharjah | 19/12/2019 |
Mr. Salem Khalifa Salem Al Suwaidi | Ajman | 02/01/2019 |
Yousef Lootah Contracting LLC | Al Mizhar | 04/05/2019 |
Mr. Khalid Ahmed Fulad Hussan | Nadal Hammar, Dubai | 22/01/2019 |
K&B Building contracting LLC | Humaideya, Ajman | 12/03/2019 |
Al Saud Company Limited | Al Majarrah, Sharjah - UAE | 18/02/2020 |
Yousef Lootah Contracting LLC | Al Mizhar, Dubai | 21/07/2019 |
Interiors International Industries LLC | Jabel Ali Industrial, Dubai | 24/10/2019 |
KSK Construction LLC | Al Wasl, Dubai | 06/10/2019 |
Mr. Yasir | Elyash, Sharjah, UAE | 16/11/2019 |
Dubai International Real Estate | Karama, Dubai | 01/08/2019 |